Project 17-08c: Morris Township, Huron County

The Johnston Pit was about 3 ha in size. The landowner was hoping to affect a gentle slope down to a pond he was building adjacent to our work area. The site was surveyed by drone to get full coverage and aid in developing a grading plan to affect an extension of the family’s back yard.