At 2.2 hectares, the Linthorst pit project graded the shallow, wet pit into an added working farm field at this dairy farm. Approximately 8,500 m3 of material were moved to reshape this field.
At 2.2 hectares, the Linthorst pit project graded the shallow, wet pit into an added working farm field at this dairy farm. Approximately 8,500 m3 of material were moved to reshape this field.